Does the signed pool contract include the haul-away on your Nashville bid?

Trace Nashville pool excavation and haul-away promises from the accepted bid to the signed contract, then confirm who pays for extra loads.

Editorial desk   ·   2026-11-24
Two excavators on construction site with dirt piles
Photo by Annie Spratt on Unsplash

Check whether the signed agreement includes the dated bid

Suppose your Nashville pool bid includes haul-away of excavated soil, but your signed scope lists only excavation. Open the accepted bid beside the signed agreement. Check whether the agreement incorporates the bid by date or revision and whether that version is attached to your signed copy. Send the contractor both passages and ask who is responsible for hauling the soil. You can use the same comparison for the fiberglass shell model, deck area, and equipment package.

Pin down the load allowance and receiving fees

Ask how many loads the price covers, who pays the receiving fees, and what each additional load costs. If an exhibit allows one truckload and you expected all excavated soil to be removed, ask what happens to the soil left after the first truck leaves.

Metro Nashville’s convenience centers exclude commercial waste and waste brought in commercial vehicles, including vehicles with commercial advertising or commercial tags. Ask which facility the hauler plans to use for your project and whether it accepts excavated soil. Confirm whether the bid covers both the trucking and the facility’s receiving charge.

Put any agreed haul-away change in a signed amendment

If you and the contractor agree to change the signed scope, ask for a dated amendment you both sign that identifies the original agreement and the affected line item. Have it state who hauls the soil, the included load allowance, who pays the receiving fees, the rate for extra loads, and who must approve them before they’re hauled. Keep the amendment with the bid and signed contract. Save any extra-load approvals and haul tickets there too, so you can check them against the final invoice.