Add the ground work outside the pool area
Start the takeoff with the full disturbance outline. If the pool and deck work disturb 760 square feet and a separate access strip adds 300 square feet, the estimate is 1,060 square feet. Count overlapping areas once and flag any area the excavator has yet to confirm. Chattanooga’s permit page says review may lead to a land disturbing permit at 1,000 square feet of disturbance or more, or near state waters or wetlands. Land Disturbing Permit | Chattanooga.gov Land Development Office | Chattanooga.gov
Ask about the scope you actually priced
Send the address, marked boundary, area estimate and any nearby water features to Chattanooga’s land disturbing team. The Land Development Office lists 423-643-5892 for land disturbing permits, plan review and inspections. Ask what the team needs to determine the permit path. If the excavator proposes a different access route after that conversation, update the drawing and check whether the change affects the answer.
Assign the review work in the estimate
If the project goes through the land disturbing permit process, Chattanooga lists a narrative, checklist and site plan with erosion and sediment control details as minimum application materials. Identify who will prepare and submit that package and who will respond to comments. While the determination is pending, state the disturbance area and access route your estimate assumes and identify which scope items depend on the city’s response.
