Skip to content
Grade & Gravel
Standard editorial article   /   Tennessee

Build the Nashville Pool Permit Pack Around the Site Sketch

Prepare a Nashville residential pool site plan, file it with Metro, and confirm how to handle a gate move before the crew builds it.

Editorial desk   ·   2026-11-24
Two excavators on construction site with dirt piles
Photo by Annie Spratt on Unsplash

Show the pool and equipment on the drawing

Mark the proposed locations of the pool, pump, and filter on the site plan. Label distances to property lines and easements so the zoning examiner can review the layout for that parcel. Date the drawing and keep a copy with the application so the office and field crew can identify the version Metro received.

File the plan and track Metro approvals

File the site plan with the Residential Permit Application and the pool alarm receipt. Submit the package through the Zoning Help Desk or, if you’re a registered contractor, apply through ePermits. Email Permit Issuance for portal credentials. After processing, the zoning examiner supplies a checklist of approvals needed before permit issuance. Use it to track which Metro offices still owe signoffs.

If the project serves a shared clubhouse, ask Metro Public Health whether its public pool rules apply.

Clear a gate move before installation

If a paved path forces a gate move after filing, date the revised plan and compare it with the fence proposal and the homeowner’s signed layout. Mark the revision as pending and ask the Zoning Help Desk what documentation or review the change requires. Hold work on the changed gate until Metro confirms how to proceed and any required review is complete. Give the crew the cleared drawing and pull superseded copies from the field packet.

Sources